Reference Projects

• Mechanical Planning and Activities Coordination
• Provision of Mechanical Team
• Scaffolding Activities
• Welding Repair
• Painting Activities

• Mechanical Planning and Activities Coordination
• Provision of Mechanical Team
• Scaffolding Activities
• Welding Repair
• Painting Activities

• Provision of welders Team for Zueitina Project

• Mechanical Installation including welding Of Pipeline
• Civil Work
• Hydrotest and Commissioniing

• Mechanical Work
• Civil Work
• Electrical and Innstrumentation work
• Well Area Housekeeping and Pipe Cleaning

Provision of Technical Assistance Team for 3 x Years Operation and Maintenance activities in Mellitah Complex
• Manpower Provision Including Senior Position

• Engineering and lay out of Work Documentation
• Civil Work
• Mechanical Work including Pipe Prefabrication and welding Activities
• NDT Inspection
• Grit Blasting and Painting Activities
• Hydrotest and Commissioniing

• Engineering and lay out of Work Documentation
• Desludging and Cleaning of 12 Vessels API Separators
• Electrical and Instrumentation Rehabilitation
• Mechanical Repair as per API Standard

• Engineering and lay out of Work Documentation
• Civil Work
• Mechanical Work including Pipe Prefabrication and welding Activities
• NDT Inspection
• Grit Blasting and Painting Activities
• Hydrotest and Commissioniing

• FEED Design and faisability Study
• Detailed Engineering Study
• Lay Out Of BOQ And Tender Documentation

• Engineering and lay out of Work Documentation
• Civil Work
• Mechanical Work including Pipe Prefabrication and welding Activities
• NDT Inspection
• Grit Blasting and Painting Activities
• Pipeline Coating
• Hydrotest and Commissioniing

• Engineering and lay out of Work Documentation
• Civil Work
• Mechanical Work including Pipe Prefabrication and welding Activities
• NDT Inspection
• Grit Blasting and Painting Activities
• Hydrotest and Commissioniing

• Engineering and lay out of Work Documentation
• Civil Work
• Mechanical Work including Pipe Prefabrication and welding Activities
• NDT Inspection
• Grit Blasting and Painting Activities
• Hydrotest and Commissioniing

• Provision of Technical Assistance Team for 3 x Years Operation and Maintenance activities in SABRATAH OFFSHORE PLATEFORM
• Provision Of Permenant Painting Team
• Provision of Mechanical Team
• Provision of Painting Equipment

• Civil Work
• Mechanical Work including Welding, Pipe rack Construction, Pipeline installation
• Electrical and Innstrumentation work

• Tank Isolation, Opening and Gas Freeing
• Tank Cleaning and insulation Removal
• Tank Grit Blasting and Painting
• Insulation Installation
• Piping Network Maintenance and Testing

• Pipe Spools Prefabrication and Welding Activities
• Inlet - Outlet Turbo Compressor Piping Re-installation
• Pipe Rack Re-installation
• Painting Touch Up
• Housekeeping

• Civil Work
• Mechanical Work Pipeline installation
• NDT
• Painting and Wrapping

• Tank Isolation, Opening and Gas Freeing
• Tank Cleaning
• Internal Sweep Blasting for Inspection

• Tank Isolation, Opening and Gas Freeing
• Tank Cleaning and insulation Removal
• Tank Lifting and Bottom Replacement
• Heat Exchanger Maintenance
• Tank Grit Blasting and Painting
• Tank Accessories Maintenance and Painting
• Insulation Installation
• Piping Network Maintenance and Testing

• Roof Demolution
• Procurement of Sandwitch Pannel
• Steel Structure Reinforcement and Painting
• Electrical Maintenence
• Plumbing and Sanitary Replacement
• Housekeeping

• Engineering documentation
• Civil Work including Right Of Way and Trenching
• Procurement
• Pipeline Welding
• NDT and Hydrotesting
• Pianting and Wrapping
• Road Crossing
• CP System Installation
• Commissionning

• Civil Work
• Mechanical Work Pipeline installation
• NDT
• Painting and Wrapping

• Maintenance of Steel Structure
• Pianting and Wrapping
• Electrical Maintenance

• Pipe Spools Prefabrication and Welding Activities
• Provision of Mechanical Team (Welder + Pipefitter) "Over 100 Personnel at Site Job"
• Provision of Certified Scaffolding Team
• Pipe Rack Re-installation
• Painting Touch Up

• Engineering Work
• Procurement of CP System
• Installation of the CP System
• Commissionning and Startup of the System